Stockpiles in VYROX Quarry (AIKuari) shows how many tonnes of each product you hold, how many days each pile lasts at this week's rate of draw, and the moisture in each pile after rain. Moisture matters because wet stone costs fuel to dry at the asphalt plant. Plant managers and sales staff use it to plan production and promise deliveries.

Note

This guide is based on the AIKuari (VYROX Quarry) demo, which runs on sample data for a fictional company, Demo Quarry Sdn Bhd. Every figure shown is a sample value, not a measured result or a guarantee. Screens, labels, limits and menus may differ in a live deployment, depending on how VYROX sets up your sites and your role.

Piles

Open Stockpiles from The Chain group. The Piles, North Quarry card lists each pile at the site.

ColumnWhat It MeansSample Value
PileProduct and whether the pile is open or covered14 mm, open
TonnesBook stock3,120
Days of CoverTonnes divided by this week's average daily draw5.8
MoistureLatest moisture, with a badge that turns to warning when the pile is wet4.6 %

How Stock Is Worked Out

Book stock comes from belt scales and deliveries, checked against the latest survey. The product website also describes tracking survey drift, the difference between book stock and survey.

Rain and Moisture

The Rain and Moisture card shows a bar chart of rainfall over the day and a line that points to the driest pile, for example "Plant A1 draws its 14 mm from the open pile. The driest 14 mm is the covered pile at 3.1 %." With no rain it reads "No rain in the last 24 hours."

After rain, press See the Cost at Plant A1 to open the Asphalt Plant screen and see what the wet stone costs in drying fuel.

Tip

When an asphalt plant draws from a wet pile, the Asphalt Plant screen recommends switching to the drier one. See Asphalt Plant.

Ask AI

Ask "How much 14 mm stock is left?" and Ask AI answers with tonnes and days of cover per pile, and how it worked them out.

Devices Used

Belt Scale (VX-BS100), Radar Level Sensor (VX-RL410) for silos and bins, Weather Station (VX-WS500) and Aggregate Moisture Probe (VX-MP100).

Frequently Asked Questions

Why Does Days of Cover Change During the Week?

It uses this week's average daily draw, so a busy week shortens it.

Where Does the Moisture Reading Come From?

From moisture probes and the weather station set up with VYROX for your piles and bins.

How Often Should We Survey?

As often as your site needs. Each survey is the check on the book stock.