AiTenderBid is AI tender, bid and estimating software for Malaysian construction contractors. It finds the tenders that fit you every morning, reads the whole tender pack, prices the Bill of Quantities with a confidence score on every item, flags contract risk and drafts the programme, RFQs and QHSE documents. Your people approve every step; the AI never sends anything on its own.
Built and AI-powered by VYROX AI on the AiServa platform, by VYROX INTERNATIONAL SDN BHD.

End to End
The work is split on purpose. The AI reads, measures, judges prices and drafts. The server does every deterministic job: BQ parsing, totals, checks, scheduling, risk scoring and every Excel, Word and PowerPoint file. People decide.
At 07:00 Malaysia time it searches 8 sources, filters by state, CIDB grade, Bumiputera status, value and closing date, then downloads each public tender document into your Knowledge Base.
A weekly check of public construction material prices, recorded with the current and previous price, source, location and date beside your own supplier quotes.
Attach the tender pack and type /prepare-bid. A quick scan reads the BQ and drawings, a short interview settles your assumptions, and an 8-role AI bid team gets to work.
Material, labour and plant build-up, an independent take-off linked back to the drawing, and a confidence score on every line.
Contract, commercial, technical, QA/QC, HSE and clarification issues, each with the document, page, clause and quoted wording, filed in six registers.
Your team reviews in an Excel-style editor, comments on any cell, locks what is final and exports up to 19 reports for the submission and the bid meeting.

Tender Search and Market Prices
/prepare-bid
Each role writes its own findings and raises its own issues. A bid lead pulls them together into a summary and a plain-English report: the total, finish date against completion, how much was measured, derived, assumed or missing, the top three risks and the open questions.
Reads every drawing page by page, one note per drawing, and never guesses an unreadable value.
Prices every item, checks BQ errors and takes off quantities independently of the BQ.
Plant, logistics, interfaces, a technical risk register and method statements from your past submissions.
A contract risk register clause by clause, plus a tender clarification list.
Inspection and Test Plan, testing schedule and a Project Quality Plan.
Tender HSE compliance checklist, HIRARC, safety methods and an HSE plan.
A tender programme of 30 to 150 activities; the server computes the dates.
Labour and plant per activity, key materials with lead days and key personnel.

BQ Pricing
Each item carries a rate build-up, a remark and quantity workings that link back to the drawing note they came from. Every item is only as confident as its weakest input.

Contract Risk, RFQs and Programme
Malaysian Standards
It detects the method of measurement in the BQ, places items in the right work section and flags unit mismatches. Your answers in the interview always override.
| Methods of Measurement | SMM2, SMM3, CESMM2, MyCESMM and NRM2 |
|---|---|
| Contract Forms Compared | PWD 203A, PAM 2018, CIDB 2022 and FIDIC |
| Safety and Health | OSHA 1994 with its 2022 amendments, FMA 1967, BOWEC 1986, DOSH guidelines and CIDB; HIRARC on the DOSH 5 by 5 matrix |
| Contractor Registration | CIDB grades G1 to G7 and codes, Bumiputera status filtering |
| Reports | 19 reports in Excel, Word, PowerPoint and MS Project, including the priced BQ, bid briefing deck, issue registers, submission checklist, 80-item bid risk list and programme |
Who It Is For
Decide go or no-go on facts: eligibility, key facts, past bids and the risk list, before the bid meeting.
Start from a priced, reasoned BQ instead of a blank one, and spend your time on the amber and red lines.
Programme, resources, registers and the submission checklist, kept in one place with an append-only audit log.
Building, civil and infrastructure, marine and port contractors are all covered, from SMM2 building bills to CESMM2 and MyCESMM civil bills. See who it is for role by role.
FAQ
AiTenderBid is AI tender, bid and estimating software for Malaysian construction contractors, powered by VYROX AI and built on the AiServa platform by VYROX INTERNATIONAL SDN BHD. It searches Malaysian tenders daily, reads tender packs, prices the Bill of Quantities with a confidence score on every item, raises contract and technical issues, drafts RFQs, a CPM tender programme, resource plan, ITP and HIRARC, and exports 19 reports.
Every day at 07:00 Malaysia time it checks 8 switchable sources: the open web and newspaper adverts, MyProcurement and ePerolehan, JKR (federal and state), state governments and agencies, ports and marine authorities, utilities and GLCs, developers and private employers, and CIDB. Your organisation can add its own sites.
No. People approve every step. The AI reads, measures, judges prices and drafts, but it never sends anything on its own. RFQs are written as Word and Excel files for your team to send, and changes from /update-bid are applied only after a person replies to the plan.
Each BQ item gets a material, labour and plant rate build-up, a remark and a confidence score: green at 75 and above, amber from 50 to 74, red below 50. The AI does an independent take-off and raises a commercial issue where its quantity differs from the BQ by more than 5%. The server, not the AI, does all arithmetic.
Methods of measurement SMM2, SMM3, CESMM2, MyCESMM and NRM2. Contract clauses are compared with PWD 203A, PAM 2018, CIDB 2022 and FIDIC. HSE checks reference OSHA 1994 with its 2022 amendments, FMA 1967, BOWEC 1986 and DOSH guidelines, and HIRARC is scored on the DOSH 5 by 5 matrix.
Take the product tour at aitenderbid.com/product-tour/ for a screen-by-screen walkthrough, or book a demo at aitenderbid.com/contact/ to see it work on one of your own tenders.
AiTenderBid is live at aitenderbid.com. Take the product tour, or book a demo with the VYROX team.
Talk to us
Tell us what you are trying to run. We will show you the modules that fit, and say plainly if something you need is not there yet.