VYROX Apps · PlanTask88, InstaClaim, AI Doctor and POS Printer Connector: App Guides
Reports in PlanTask88 summarise the tasks, time worked and out of range visits for a chosen period, and rank each employee by completed tasks with their hours, average task time and on-site compliance percentage. Managers use it for monthly timesheets, productivity reviews and checking that visits really happened on site.
Tap a chip at the top of Reports:
| Chip | Covers |
|---|---|
| Today | Tasks started today. |
| Month chips (for example Aug, Jul, Jun) | Each of the last three full calendar months, most recent first. |
| Custom | Opens Custom date range; set From and To. |
| All time | Every task. This is the default. |
Periods match the task's start date.
| Card | What It Counts |
|---|---|
| Total tasks | Tasks started in the period. |
| In progress | Of those, tasks still running. |
| Completed | Of those, tasks completed. |
| Flagged | Tasks started or ended out of range. |
| Total time | Sum of the durations of completed tasks, shown in hours and minutes. |
If any task ran longer than the time limit your admin sets (12 hours by default), a warning card appears such as "2 tasks ran over 12h". It explains that this is likely a missed check-out that inflates Total time, and shows the realistic time worked with the excess removed. Total time itself is not changed.
Below the cards, Employee performance lists each person with:
| Item | Meaning |
|---|---|
| Name and email | The employee. Admins are marked admin. |
| done | Completed tasks in the period. The bar compares each person with the top performer. |
| total | All tasks started in the period. |
| in progress | Tasks still running. |
| Hours | Total time on completed tasks. |
| avg | Average time per completed task. |
| on-site | Percentage of tasks that were not flagged out of range. Green is 95% or more, amber 80% to 94%, red below 80%. |
If nobody worked in the period you see "No employee activity yet for this period."
A task left running is counted until it is completed or auto-closed. Look for the long-task warning card and correct those tasks in Tasks.
No. Only completed tasks with an end time add to Total time.
It is the share of the employee's tasks in the period that were not flagged out of range at start or end. A person with no tasks shows 100%.
PlanTask88 does not have an export button. Use the figures on screen or take a screenshot.