Block B is handed over. On time, zero lost-time injuries. Thank you to every hand on site.
Blok B telah diserahkan. Tepat pada masa, sifar kecederaan hilang masa. Terima kasih kepada semua di tapak.
B座正式移交。准时完工,零工时损失事故。感谢每一位工地同仁。
Free tools may keep it. It cannot be recalled.免费工具可能会保留数据,而且无法收回。
098765432109876543210km
Local本地 Between your data and the AI数据与 AI 之间的距离 Cloud AI: an overseas data centre云端 AI:海外数据中心098765432109876543210B
Private私有 Sent outside your walls发送到公司外部的数据 Cloud AI: every prompt sent out云端 AI:每条提示词都外发RM098765432109876543210
Owned自有 In token bills, ever永远没有 token 账单 Cloud AI: billed per token云端 AI:按 token 计费
Kimi K3
Source: Artificial Analysis Intelligence Index v4.3.2, artificialanalysis.ai, read 30 Sep 2026. Top 25 models, each at its highest-scoring setting (Qwen3.8 27B: xhigh). Licences as listed on each model’s page; check the licence before production use. Logos are their owners’ trademarks, shown to identify each model.数据来源:Artificial Analysis 智能指数 v4.3.2(artificialanalysis.ai),2026 年 9 月 30 日读取。前 25 名模型,均取各自得分最高的设置(Qwen3.8 27B:xhigh)。许可信息来自各模型页面,投入生产前请核对许可。各商标归其所有者所有,此处仅用于标识模型。
Local LLM本地大模型P-12 is a 600 mm bored pileP-12 是 600 毫米钻孔桩1
The BQ prices it at 1,250 m工程量清单按 1,250 米计价2
Spec clause 8.4 allows it规范第 8.4 条允许3
3 passages, best match first
20.1.1 … give notice of any claim … within 28 days after becoming aware …
We give notice of a claim for extension of time … within 28 days …
20.2.1 A fully detailed claim … shall be submitted within 42 days after the event.
Give notice within 28 days of becoming aware
Miss it, and the claim is time-barred
Your draft notice is already saved
20.1.1 The Contractor shall give notice of any claim for additional time or money within 28 days after becoming aware, or when it should have become aware, of the event giving rise to the claim.
20.1.2 If the Contractor fails to give notice within 28 days, the Contractor shall not be entitled to any extension of time or additional payment for that event (time bar).
20.2 Detailed Claim
Matches the SourceWe give notice of a claim for an extension of time arising from the late issue of the piling drawings. This notice is given within 28 days of the Contractor becoming aware of the event.
A fully detailed claim will follow within 42 days under Clause 20.2.
Drafted by AI Agent from Clause 20.1. Saved to Contracts.
Saved in the Knowledge Base
10 / 10Final Submission Audit递交前终审Audit Passed. Ready to Submit.终审通过,可以递交。
Bid Readiness投标就绪度
Run the final submission audit. If it passes, ask the GM to sign off.
Audit passed: all 214 requirements met, all 46 items in and both errors fixed. The sign-off request is ready.
Email Draft
To
Subject
:
Answers use only organisation data you are allowed to see. AI can make mistakes: check before acting.
Show
Overdue (0)
Today (0)
Wednesday (0)
Thursday (0)
Friday (0)
Today
Tender Pack7 documents
1,062pages read
Key Factscited
214requirements61 mandatory
Requirements Register214 rows · each cited
R-001Bid bond, 5% of the tender sumITT 7MandatoryR-014Pile concrete C50/60, 75 mm coverSpec 5.3.2MandatoryR-037Project manager, 3 marine jobsITT 3.2MandatoryR-052ISO 9001, 14001 and 45001ITT 3.5MandatoryR-088Programme in Primavera P6Spec 1.8ScoredR-121Marine piling method statementITT 9.2Scored198of 214
Compliance Matrixneeds action first
R-066Dredging, 2 vessels on callCheckingGapR-052ISO 45001, valid on closingCheckingGapR-088Programme in Primavera P6CheckingPartialR-102Local content, 30%CheckingPartialR-037Project manager, 3 marine jobsCheckingComplySchedule A · Returnable Items46 required
41 in the folder5 missing
Sections9 · 42 p
Technical ProposalPage 12 of 42
2. Methodology
Piles are driven from a jack-up barge at the jetty head, in the morning tide windows. Each pile is cast in Grade C50/60 concrete with 75 mm cover, as Cl. 5.3.2 requires, and one pile in every ten is tested by PDA.
2.1 Sequence
Casing, boring, cage, tremie pour: one pile a day for each rig.
EvidenceMS-014Jetty ASpec 5.3.2
Tender SumRM 186.4M
By TradeRM million
Past Projects126 searched
Risk Matrix14 risks
3 High6 Medium5 Low
Risk AllowanceRM 2.4M
Submission Folder38 files · 612 pages
100of 100
Tender T-118 · Port ExpansionReady to Submit
Signed Off
GET /v1/usage200 OK
17:30Project Manager项目经理Day Closed. Tomorrow Set.今日收工,明日就绪。
Wrap up my day.
Two of three done today. Subcon Claim 7 moves to 9:00 AM tomorrow, before Site Coordination.
Email Draft
To
Subject
To-Do List Updated:Moved: Sign Subcon Claim 7
Answers use only organisation data you are allowed to see. AI can make mistakes: check before acting.
Show
Overdue (0)
Today (0)
Wednesday (0)
Thursday (0)
Friday (0)
Today
Research Helper18 sources
1
2
Site Diary29 Sep · L7
Receivables AgingRM · 29 Sep
Past 60 days RM 680k
5of 212 CVs

Block B is handed over. On time, zero lost-time injuries. Thank you to every hand on site.
Blok B telah diserahkan. Tepat pada masa, sifar kecederaan hilang masa. Terima kasih kepada semua di tapak.
B座正式移交。准时完工,零工时损失事故。感谢每一位工地同仁。
Best SlotThu 9:00 AM
LWDesignAsks
CDManagementApproves
Access7 Days
Recommend Bidder C · 86 / 100
Contractor Search
AiServa is working in this tabStop
InvoiceINV-2026-0931 · 29 Sep 2026
Amount DueRM 1,187,500.00
Checked by CalculatorRebar · 180 tRM per tonne · need by 15 Oct
374pages · 9 sections
12 blank pages out
Progress68%Plan 71%
Cost to DateRM 42.1MOn budget
Safe Days412No LTI
PlannedActual−3% · L7 slab